Rooms
Total of the rooms
First, let's have a look at the number of rooms. The location of each of the rooms rooms can be found on the groundplan. The total of the hotel holds:
- 80 standards rooms (unrenovated)
- 28 rooms located on the ground floor, numbers 1 - 29 (room number 13 doesn't exist) see groundplan.
- 40 rooms located on the first floor, numbers 30 - 69 see groundplan.
- 12 rooms located on the second floor, number 70 - 81 see groundplan just room 81 is not on the plan. It has recently been build next to room 80.
- 20 renovated rooms
- 20 rooms located on the first floor, numbers 110 -130 (room number 113 doesn't exist) see groundplan.
The total of the rooms available, is called the inventory.
Inventory of the rooms
The rooms are equipped for two people (double occupancy) sometimes a third bed is possible. There are no 'single rooms', so if required, one of the rooms is used as such. All rooms, including the unrenovated ones, have:
- A coffee machine and a kettle
- Cable TV, central WiFi only 100% in the hallways and other 'public' places. Not too good in the rooms, therefore
- A terrace (on the ground floor) or a balcony
- The toilet in the bathroom
- Shower in bathroom
- Small workspace, with two chairs
- A total area of minimum 24 m2
In addition to the above inventory, the renovated rooms have:
- A double sink
- A shower and a bath
- Dedicated internet access per room via cable and WiFi
- New interior
- Separate toilet (not in the bathroom)
- A total area of minimum 35 m2.
- Modernized interior
- Located at the rear, so park view
The photos shown will give an impression of what they look like.
Renovated rooms
Standard rooms
Video playlist
Have a look at the videos of the rooms. The first playlist is of videos related to the renovated rooms.
To see all the videos related to this item, click the three small bars in the top right-hand corner of the video .
Then you will see all the videos in this playlist, so you can choose the ones you want to see.
What does the hotel look like?
To see what the hotel looks like, there are eight pages:
→ Go! Rooms | Reception | Restaurant | Hotel exterior | Banqueting | Facilities | Park | Terrace
Upgrading?
For a reliable starting point on hotel equipment costs, you can refer to this Nehmer Cost Guide. It provides an overview of expenses related to room renovations. Alternatively, you may also consult Operto Operto’s guide or horwathhtl the Horwath HTL report for further insights. These resources will give you a clear idea of renovation and investment costs.
For a good starting point, for example, of the cost of hotel 'equipment', you can look this guide: https://www.nehmer.com/costguide.
This gives an overview of costs related to renovating the rooms.
Or use Operto or horwathhtl to get an idea. Check for details on costs of new investments. Feel free to use another guide, if that is more appropriate for your hotel. Do not get lost in too many details; rather think in hundreds and thousands of euro's.
New venues
As new Management Team, you have more freedom in setting up a new concept and changing the hotel. So, this also applies to the rooms and facilities; you can use the decision 'investments' for this purpose. You can invest a maximum of € 900,000 per year in this. Possibly, you can also 'use' the item other costs within the decisions to a maximum of € 100,000 per year. There are no liquidity problems in financing such investments.
What do others offer? Check the file on competitors.
→ Go! Following the Introduction to the Hotel? Step 4/10 is the Competition page, click here