Rooms: Difference between revisions

From Emerald Forest Hotel
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
''→ Go! [[:Category:Hotel info]]''
''→ Go! [[:Category:Hotel info]]''
{{Running Game}} __NOTOC__ __NOEDITSECTION__  
{{Running Game}} __NOTOC__ __NOEDITSECTION__  
== What does the hotel look like? ==
To see what the hotel looks like, there are eight pages: <br>
''→ Go! [[Rooms]] | [[Reception]] | [[Restaurant]] | [[Outside hotel]] | [[Banqueting]] | [[Facilities]] | [[Park]] | [[Terrace]] ''<br><br>
== What does the hotel look like? ==
== What does the hotel look like? ==
To see what the hotel looks like, there are eight pages: <br>
To see what the hotel looks like, there are eight pages: <br>
Line 11: Line 8:
This gives an overview of costs related to renovating the rooms.<br>  
This gives an overview of costs related to renovating the rooms.<br>  
Or use [https://operto.com/hotel-renovation-costs-per-room/ Operto] or [https://cdn.horwathhtl.com/wp-content/uploads/sites/2/2020/01/Industry-Report_ITALY_Construction-Renovation-Costs.pdf horwathhtl] to get an idea. Check to get a grip on [[costs]] of new [[investments]]. Feel free to use another guide, if that is more appropriate for your hotel. Do not get lost in too many details: rather thinks in hundreds and in thousands of euro's.''
Or use [https://operto.com/hotel-renovation-costs-per-room/ Operto] or [https://cdn.horwathhtl.com/wp-content/uploads/sites/2/2020/01/Industry-Report_ITALY_Construction-Renovation-Costs.pdf horwathhtl] to get an idea. Check to get a grip on [[costs]] of new [[investments]]. Feel free to use another guide, if that is more appropriate for your hotel. Do not get lost in too many details: rather thinks in hundreds and in thousands of euro's.''
<br>
<br>
<br>



Revision as of 15:27, 1 June 2023

→ Go! Category:Hotel info  

What does the hotel look like?

To see what the hotel looks like, there are eight pages:
→ Go! Rooms | Reception | Restaurant | Outside hotel | Banqueting | Facilities | Park | Terrace

A good starting point for as an example of the cost of hotel 'equipment', you can find in this guide: https://www.nehmer.com/costguide.
This gives an overview of costs related to renovating the rooms.
Or use Operto or horwathhtl to get an idea. Check to get a grip on costs of new investments. Feel free to use another guide, if that is more appropriate for your hotel. Do not get lost in too many details: rather thinks in hundreds and in thousands of euro's.

Total of the rooms

The location of the rooms can be found on the groundplan.
The total of the hotel holds:

  • 80 standards rooms
    • 28 rooms located on the ground floor, numbers 1 - 29 (room number 13 doesn't exist) see groundplan.
    • 40 rooms located on the first floor, numbers 30 - 69 see groundplan.
    • 12 rooms located on the second floor, number 70 - 81 see groundplan just room 81 is not on the plan. It has recently been build next to room 80.
  • 20 renovated rooms
    • 20 rooms located on the first floor, numbers 110 -130 (room number 113 doesn't exist) see groundplan.

The total of the rooms available, is called the inventory

Photos of the rooms in the Emerald Forest Hotel

As explained, there are 20 renovated rooms so far. The photos shown will give an impression of what they look like.

Renovated rooms

An impression of these rooms:

Renovated rooms Emerald Forest Hotel
Renovated rooms

The other 80 rooms have not yet been renovated: often they are referred to as standard. This does not mean that they are in bad shape, but they are not really up-to-date. The photos give an impression of what they look like.

Standard rooms, not renovated rooms

An impression of these rooms:

Standard rooms Emerald Forest Hotel
Standard rooms

Video playlist

Have a look at the videos of the rooms. The first playlist is of videos related to the renovated rooms.
To see all the videos related to this item, click on the video in the top right-hand corner on the three small bars. Then you will see all the videos in this playlist, and you can choose the ones you want to see.


Video playlist rooms Emerald Forest Hotel

Inventory of the rooms

The rooms are equipped for two persons, sometimes a third bed is possible.
All rooms, including the non-renovated ones, have:

  • A coffee machine and a kettle.
  • Cable TV, central WiFi only 100% in the hallways and other 'public' places. Not too good in the rooms, therefore.
  • A terrace (on the ground floor) or a balcony.
  • The toilet in the bathroom.
  • Shower in bathroom.
  • Small workspace, with two chairs.
  • A total area of minimum 24 m2.


In addition to the above inventory, the renovated rooms have:

  • A double sink.
  • A shower and a bath.
  • Dedicated internet access per room via cable and WiFi.
  • New interior.
  • Separate toilet (not in the bathroom).
  • A total area of minimum 35 m2.
  • Modernized interior.
  • Located at the rear, so park view.

New venues

If your assignment becomes managing one of the new venues, you have more freedom in setting up a new concept. So, this also applies to the rooms and facilities. You can use the [[decisions}decision]] 'investments' for this purpose. You can investment a maximum of € 900,000 per year in this. Possibly, you can also úse' the item other costs within the decisions to a maximum of € 100,000 per year. There are no liquidity problems in financing such cost investments.

What do others offer? Check the file on the competitors.

→ Go! Following the Introduction to the Hotel? Step 4/10 is the page Competition, click here


→ GO! Top of this page

Emerald Forest Hotel offering an emerald hotel experience! | Run your own hotel in this management simulation.